3,528-acre publicly owned Megasite

Ready for single or multiple industrial users

Scalable Workforce Pipeline

$68 million invested in this pipeline with over 1500 students yearly

Community Commitment

Over $150 million invested in site and infrastructure

 SOUTHERN VIRGINIA MEGASITE at Berry Hill

Experience an extraordinary advanced manufacturing workforce complimented by a pipeline of prepared students. Benefit from significant infrastructure investments that guarantee your success in Virginia’s largest certified Megasite with rail, natural gas, terabyte speed broadband, electric, water, sewer, permitting and zoning in place.

Over $200M of investment in infrastructure development ensures that industry risks are minimized at one of the largest Megasites on the East Coast. This central Mid Atlantic location is accessible to 2/3rds of the US industrial base within a one-day drive with direct access to international trade from Virginia’s port, the deepest on the East Coast.

Fast Facts

Quest Site Solutions Certified Mega Site / Super Park

3,528-acre publicly owned Mega Site, the largest in Virginia and southeast United States

Unique collaboration amongst multiple jurisdictions in 2 states

Suitable for OEM manufacturing operations and other large advanced industrial tenants

Ready for single or multiple industrial users

Largest possible contiguous parcel is 2,102 acres

Existing 200 acre graded pad expandable as needed

Ultimate water capacity will be over 5.75 MGD expandable to 7 MGD, fed by 2 independent sources

3 MGD sanitary sewer system, expandable to 4 MGD

Direct access to Williams Transco Pipeline via existing gate station onsite

Onsite Class I rail - Norfolk Southern

VEDP Certified Tier 5 pad site, the highest designation give to shovel ready sites

Strategic
East Coast Location

Within 1 day’s drive of 60% of the US population and 2/3 of the US industrial base

Direct route to Mid-Atlantic Gateway at Port of Virginia

Scalable Workforce Pipeline

$68 million invested in this pipeline with over 1500 students yearly

Community Commitment

Over $150 million invested in site and infrastructure

Accessible

Within a day’s drive of 60% of the US population & 2/3 of the US industrial base

Affordable

Stable taxes and manufacturing costs 18% below the national average